
East Penn Manufacturing, is battery finish and distribution center. This facility was built on a 40-acre greenfield site. It is a 345,000 SF pre-engineered and conventional steel frame building with pre-cast concrete and insulated metal panel exterior.
It was designed to FM global standards. With 58,000 SY of concrete paving, 24 miles of pipe, over 200 miles of wire, 1,365 control valves, and 3,500 hours of BIM coordination and modeling…it is certainly a project for all involved to be proud of!
Des Moines, IA "Corporate"
5518 NW 88th Street
Johnston, IA 50131
Iowa City, IA
Nashville, TN
Copyright 2023 Bluestone Engineering. All Rights Reserved